MEPCO Load Shedding and Shutdown Schedule

Last checked 26 September 2026

MEPCO Load Shedding and Shutdowns title card: Planned shutdowns, feeder status, outages

MEPCO's load shedding schedule is feeder-wise: the hours your home loses power depend on the 11 kV feeder that supplies it. Look up that feeder on PITC's Load Management Portal, check MEPCO's Electricity Shutdown page for planned maintenance, and report any other cut to 118. This guide explains the three kinds of power cut, where each is announced and what MEPCO must do when supply fails.

Load shedding, planned shutdown or fault?

A power cut is one of three things: load shedding under MEPCO's load management schedule, a planned shutdown for announced maintenance work, or a fault such as a tripped feeder or a damaged transformer.

NEPRA's Consumer Service Manual defines an interruption as a loss of electric power to one or more consumers. The table compares the three kinds by cause, by where they are announced and by what you should do.

Kind of power cutWhy it happensWhere it is announcedWhat to do
Load shedding (load management)MEPCO says energy demand, grid capacity and maintenance influence its load shedding plans, and that its schedules aim to share energy fairly across its regions.The feeder schedule on PITC's Load Management PortalPlan around the scheduled hours. Report a cut that runs past them.
Planned shutdownMaintenance, upgrading and repair work on the distribution system.Notices on MEPCO's Electricity Shutdown page, listed by grid station or circleNote the dates and hours, and check again nearer the day, because MEPCO says the schedule can change.
Fault (unplanned outage)Causes listed in NEPRA's manual include a fault on an 11 kV feeder, a blown fuse or damage at a distribution transformer, and tree branches or kite string touching lines.Not announced. The feeder page shows your feeder's current status.Report it to 118, by SMS to 8118 or on PITC's complaint website.
Peak hours are not load shedding. Peak hours are a billing period: homes on time-of-use meters pay a higher rate for each unit used in them. The timings for each season are on the page about MEPCO peak hours by season.

How do I check the load shedding schedule for my feeder?

Enter your 14-digit reference number on the Feeder Details page of PITC's Customer Complaint Management System (CCMS). The page shows your feeder, grid station, sub-division and feeder status, with an hour-by-hour schedule for yesterday, today and tomorrow.

MEPCO's own Load Shedding Schedule button, on its Ease of Doing Business page, opens this PITC page. To use it:

  1. Find your reference number. It is the 14-digit number near the top of your bill. The guide to the MEPCO reference number shows where to look if the bill is lost.
  2. Open Feeder Details. Go to ccms.pitc.com.pk/FeederDetails, type the 14 digits and press the search button.
  3. Read the feeder panel. It names your feeder, its grid station and your sub-division, and shows the feeder's status.
  4. Read the hourly grid. Rows run from 00:00 to 23:00 in AM and PM halves. The columns give the schedule for tomorrow, today and yesterday, with an Actual column for today beside today's schedule.
  5. Check the chart. The Feeder ON/OFF Status chart under the grid plots today's scheduled and actual off periods for your feeder.

Without internet access, ask in person: MEPCO's news release of 19 May 2025 lists load shedding information among the services of its customer facilitation centres.

No reference number? Search by feeder or grid station

The portal's feeder search finds a feeder by feeder code, feeder name or grid station name. Each result lists the feeder code, feeder name, city, grid station and distribution company. Its Search by Reference# / Feeder Code button leads back to Feeder Details, which also accepts the 6-digit feeder code in place of a reference number (checked 26 September 2026).

Where your feeder name is printed

NEPRA's Consumer Service Manual (section 6.4.1) says a bill should generally show the names of your division, sub-division and feeder, so open your latest bill with the MEPCO bill checker to find them. CCMS also shows a feeder code in the customer details when you register a complaint. Note your feeder name and grid station: shutdown notices use both.

Why a schedule you found may not match your street

A timetable that is right for one area can be wrong for the next street, for five reasons:

Where does MEPCO announce planned shutdowns?

MEPCO posts planned shutdown notices on the Electricity Shutdown page of mepco.com.pk, listed by grid station or circle with their dates. Each notice opens as a PDF.

MEPCO says these shutdowns are needed for essential maintenance, upgrading and repair of the distribution system. It warns that the schedule can change for unforeseen technical or operational reasons and advises consumers to check the page regularly. Publishing them is also a licence duty: Article 30.2 of MEPCO's NEPRA distribution licence requires it to share information on planned maintenance outages through its website or portal.

How to read a shutdown notice

Notice titles name a grid station, usually a 132 kV one, or a whole circle or division, followed by a date, a date range or a month. The orders MEPCO issued on 4 September 2026 for its Multan and Vehari circles set out each shutdown in a table with these columns:

The covering text gives the purpose, such as erecting poles and stringing lines for road-widening work. It approves the shutdown subject to publication in newspapers and advance notice to important consumers, asks for announcements through mosque loudspeakers, and requires the timings to be observed strictly, with supply restored accordingly. Look for your feeder name and grid station in the table. If your feeder is not listed, check the other notices for your grid station and circle.

Two more MEPCO pages with schedules. The Crash Maintenance Program page on mepco.com.pk posts circle and division maintenance programmes, including special programmes for 11 kV feeders that trip often. The older Load Shedding Schedule for Consumer page still offered only a July 2024 load management file when checked on 26 September 2026, so rely on the PITC feeder page for current timings.

What should I do if the power goes off outside the schedule?

Treat it as a fault and report it: call 118, send an SMS to 8118, or register a complaint on PITC's CCMS website with your reference number.

MEPCO's FAQ says the complaint centre of your sub-division office can tell you when supply will be restored. When that line is busy, the FAQ gives 0800-63726 and 118, and the headquarters lines 061-9220313, 061-9220314 and 061-9220317.

Report by SMS

PITC asks for four details in an SMS to 8118: the reference number from your bill, the nature of the problem, a contact mobile number and the consumer's name.

Report online and follow it up

PITC's Register Complaint page works in this order:

  1. Find your connection. Search with the 14-digit reference number or the 12-digit mobile number on record.
  2. Check the customer details. They include your feeder code, and a Feeder Details panel on the form shows the feeder status and, when one is available, an expected restoration time.
  3. Describe the problem. Choose a category (line complaints, non-line complaints, or leads, requests and others) and a complaint type, then add details.
  4. Pass the checks. Answer the security question, then enter the 4-digit code sent to your registered mobile number to complete the registration.
  5. Track it. Use Track by Reference or Track by Ticket on the same website.

The full process, including the MEPCO SMART app, is in the guide to registering a MEPCO complaint online. Every phone number and email is on the MEPCO complaint numbers and helpline page.

What must MEPCO do when supply fails?

NEPRA's Consumer Service Manual says supply complaints are normally attended in this order: current leakage immediately on receipt, then collective complaints, then individual ones, from complaint offices that work 24 hours a day, holidays included.

Section 10.4 of the manual, in the version MEPCO circulated in November 2025, adds these duties for supply failures:

Theft is one known cause of slow restoration. MEPCO's FAQ explains that stolen line material is a criminal matter, so a police FIR and a departmental enquiry come before the material is replaced. If a supply complaint stays unresolved, escalate it in writing to PITC's Head of Quality and Assurance at qaccms@pitc.com.pk, or complain to NEPRA about MEPCO.

How do I stay safe during a power cut?

Treat every fallen or broken wire as live, keep children and animals away from it, and report it at once to 118 or the nearest MEPCO complaint centre. MEPCO's safety guide gives this advice for a line fallen on the ground and for a pole with leaking current, and asks that people and animals be kept away from any water a broken live wire has fallen into.

The guide also recommends an automatic voltage regulator with delayed start for deep freezers, refrigerators and televisions. Rain, plugs, home wiring and what to do if someone is stuck to a live wire are covered in the electricity safety tips for rain, wires and appliances.

Sources: MEPCO Electricity Shutdown, Update Load Management, Load Shedding Schedule for Consumer, Ease of Doing Business, Crash Maintenance Program, FAQ and Safety Guide pages (mepco.com.pk), MEPCO news release No. 136/2025 (19 May 2025) and MEPCO shutdown orders of 4 September 2026; PITC CCMS Feeder Details, feeder search and Register Complaint pages, and PITC's consumer awareness page; NEPRA Consumer Service Manual (as on 26 November 2025), sections 1.4, 6.4.1, 10.4 and 11.3.3; NEPRA Distribution Licence of MEPCO (9 May 2023), Article 30.2. Checked 26 September 2026.

Frequently asked questions

Is there one MEPCO load shedding schedule for Multan today?
No. MEPCO's schedule is feeder-wise, so each feeder in Multan has its own timings. Enter your reference number on PITC's Feeder Details page for today's hours, and check MEPCO's Electricity Shutdown page for maintenance at Multan grid stations.
Can I get MEPCO shutdown alerts by SMS?
MEPCO's load management page points consumers to its website, mobile app and helpline for outage updates. One of its September 2026 shutdown orders also told its IT cell to send SMS to consumers in the affected area, so keep your mobile number on record through PITC's CNIC and mobile registration.
Who should I contact about frequent power cuts in my area?
MEPCO's FAQ says frequent outages usually come from overloading of the distribution system and asks you to contact your sub-divisional officer (SDO), who can find the cause. For low voltage it names the SDO, XEN or SE of your area.
Can a business ask MEPCO to switch off its supply for maintenance?
Yes, if it has its own consumer substation. NEPRA's Consumer Service Manual says MEPCO shuts down the transformer or substation free of charge when the consumer sends a written request three days before the scheduled shutdown.