MEPCO New Connection Fee 2026

Last checked 26 September 2026

MEPCO New Connection Fee title card: Security deposit per kW and capital cost

A new MEPCO connection is paid through two demand notices: a security deposit at NEPRA's fixed rate per kW, Rs 1,220 per kW for an urban home, and a capital cost notice for the material and installation your site needs. A 2 kW urban house therefore pays Rs 2,440 in security, while the capital cost differs from site to site. This guide breaks down both notices, what makes them vary and what you pay outside MEPCO.

What does a new MEPCO connection cost?

The total is the security deposit plus the capital cost. The security deposit is a fixed rate per kW of load; the capital cost is the actual cost of material, including a 12% store handling charge, plus installation charges of 8% of that amount (NEPRA Consumer Service Manual, clauses 2.4 and 2.5).

MEPCO issues both notices at the same time, after your application, documents and site have been checked (clause 2.4.2). If you have not applied yet, start with the MEPCO new connection application. The table lists the costs you may meet and whether each appears on a MEPCO demand notice.

CostWhat decides the amountOn a MEPCO demand notice?
Security depositNEPRA's rate per kW for your tariff category and area (Annexure IV)Yes, its own notice
Material, with 12% store handlingThe material your connection needs, at MEPCO's store issue rateYes, capital cost notice
Installation charges8% of the material costYes, capital cost notice
Transformer or sharing chargesOnly for larger loads (clause 2.6)Yes, within the capital cost
Application and contract formsFree at MEPCO offices and on its website (clause 2.2.1)No charge
Stamp papersRs 50 non-judicial stamp paper for the owner's affidavit and another for the power supply contractNo, bought separately
Wiring test reportIssued by the Electric Inspector or an authorised wiring contractor (clause 2.3.7)No, it is on neither notice

Security deposit rates per kW

NEPRA fixes the security deposit per kW of load: Rs 1,220 per kW for an urban home, Rs 610 in a rural area, and Rs 1,810 or Rs 920 per kW for a commercial connection. In the table below, each row is a connection type from Annexure IV of NEPRA's manual, and the right-hand column is its deposit.

Source: NEPRA Consumer Service Manual (as on 26 November 2025), Annexure IV.
Connection typeSecurity deposit
Residential (A-1), urbanRs 1,220 per kW
Residential (A-1), ruralRs 610 per kW
Commercial (A-2), urbanRs 1,810 per kW
Commercial (A-2), ruralRs 920 per kW
General services (A-3)To be determined by NEPRA
Industrial B-1Rs 1,580 per kW
Industrial B-2Rs 2,010 per kW
Industrial B-3Rs 2,890 per kW
Industrial B-4Rs 3,560 per kW
Single-point supply C-1 (400 V)Rs 1,670 per kW
Single-point supply C-2 (11 kV)Rs 2,080 per kW
Single-point supply C-3 (above 11 kV)Rs 2,740 per kW
Agricultural tube-wells (D), including SCARP and lift pumpsRs 15,000 lump sum
Public lighting (G)Rs 3,240 per kW
Residential colonies attached to industries (H)Rs 1,560 per kW

Urban means the area of an urban local body or development authority, such as a municipal committee, municipal corporation or cantonment board. Rural means the area of a union, tehsil or zila council (CSM definitions 59 and 69). For loads above 1 kW, a fraction of half a kW or more counts as a full kW, and a smaller fraction is ignored (clause 5.2.5).

These examples multiply the load by NEPRA's rate:

ConnectionLoadWorkingSecurity deposit
Urban home1 kW1 x Rs 1,220Rs 1,220
Urban home2 kW2 x Rs 1,220Rs 2,440
Urban home2.6 kW, counted as 3 kW3 x Rs 1,220Rs 3,660
Rural home2 kW2 x Rs 610Rs 1,220
Urban home on a time-of-use meter5 kW5 x Rs 1,220Rs 6,100
Urban shop3 kW3 x Rs 1,810Rs 5,430
Agricultural tube-wellAny loadLump sumRs 15,000

Capital cost: material and installation

The capital cost is the actual cost of the material for your connection, including a 12% store handling charge, plus installation charges of 8% of that figure (clause 2.5). Every Rs 1,000 of material at the store issue rate therefore brings Rs 80 of installation charges. A further 1.5% design vetting charge applies only to housing societies, high-rise buildings, commercial plazas and multi-storey buildings.

Four more rules in clause 2.4 matter when the capital cost notice arrives:

Who pays for the meter?

You do: NEPRA's manual says MEPCO provides the metering installation at the consumer's cost (clause 4.1). The manual publishes no separate meter price, so as a practical step, ask the sub-division whether the meter is priced within the material on your capital cost notice. If MEPCO has no suitable meter in stock, it may ask you to buy one to its specification from its approved vendors, and no meter rent is then charged. For other material bought from approved vendors during a shortage, MEPCO charges a 2.5% inspection fee and 8% installation (clause 2.7).

When a transformer adds to the cost

Homes up to 20 kW and shops or offices up to 15 kW are supplied from the common distribution transformer. Above those loads, the applicant pays for a dedicated transformer or a share of an existing transformer's capacity (clause 2.6).

The table shows NEPRA's connection arrangement by type of premises and load:

PremisesLoadConnection arrangement
Home (A-1)Up to 20 kWCommon distribution transformer
Home (A-1)Above 20 kW to 100 kWDedicated transformer, or transformer sharing charges in proportion to load where the existing transformer has capacity
Home (A-1)Above 100 kWDedicated transformer
Shop or office (A-2, A-3)Up to 15 kWCommon distribution transformer
Shop or office (A-2, A-3)Above 15 kW to 100 kWDedicated transformer, or transformer sharing charges
Agricultural tube-wellUp to 8 kW; above 8 kWCommon distribution transformer; dedicated transformer

The home rows do not apply in housing schemes where the ultimate load is set for the whole scheme. Where no common distribution system exists, the connection is given on a cost deposit basis, and the cost of the transformer and low-tension line is reimbursed if MEPCO later turns that system into a common one (clause 2.6, note ii).

How MEPCO assesses the load you apply for

For an individual connection, the load you declare on the application form is treated as your connected load, subject to the wiring test report and MEPCO's verification (clause 2.11.1). The standard form lists lights, fans, air conditioners, heaters, washing machines, refrigerators, light plugs, power plugs and motors, with the number and wattage of each, and totals them in kW.

For a rough benchmark, NEPRA's manual assesses houses in housing schemes by plot size. Each row is a plot size and the right-hand column is the load assessed for a double-storey house:

Source: NEPRA Consumer Service Manual, Annexure VI. These figures are for double-storey houses (ground plus one) in housing schemes; for a single-storey house the load is taken as half. They are used to design the electrification of housing schemes; for an individual connection the load declared in the application form is the connected load, subject to the wiring test report (Annexure VI).
Plot size (house in a housing scheme)Assessed load
Up to 75 sq yd3.15 kW
Above 75 up to 125 sq yd5.0 kW
Above 125 up to 200 sq yd5.70 kW
Above 200 up to 250 sq yd6.60 kW
Above 250 up to 300 sq yd7.45 kW
Above 300 up to 350 sq yd8.75 kW
Above 350 up to 400 sq yd9.5 kW
Above 400 up to 500 sq yd10.61 kW
Above 500 up to 600 sq yd13 kW
Above 600 up to 1,000 sq yd17.74 kW

The load you choose drives more than the deposit. On a normal meter, a home's monthly fixed charge is billed per kW of sanctioned load, and at 5 kW and above a home gets a three-phase supply and a time-of-use meter with a fixed charge of Rs 675 per kW on half the sanctioned load or the maximum demand, whichever is higher. See MEPCO fixed charges per kW of sanctioned load before you decide. Running more than you declared can later bring a notice to extend the load, as the guide to increasing sanctioned load on a MEPCO connection explains.

Paying the demand notices

You have 30 days to pay the demand notices, and MEPCO may allow another 30 days if you ask at least three days before the due date (clause 2.4.3). Each notice names the bank branches that accept it, and where MEPCO offers online payment you can pay online instead (clause 2.4.4).

Your final priority number for installation is fixed once the notices are paid (clause 2.4.5). MEPCO then has to provide the connection within the Annexure III time frame once it receives full payment (clause 2.4.7). That time frame counts MEPCO's own steps from registration, so the days you take to pay are not part of it; the NEPRA time limits for MEPCO consumer services are listed on the services page. The power supply contract you sign on Rs 50 stamp paper records both notices by number, date and amount paid (Annexure II). For tracking, printing and safe payment, see how to track and pay your MEPCO demand notice.

Never pay a person. PITC warns never to send money for a new connection, meter or any other electricity service to anyone's personal Easypaisa, JazzCash or bank account. Pay the demand notice only where it says, and report such requests to the 118 helpline.

Sources: NEPRA Consumer Service Manual with amendments and clarifications as on 26 November 2025, circulated by MEPCO on 28 November 2025 (clauses 2.2-2.11, 4.1 and 5.1-5.2; Annexures I, II, IV and VI); NEPRA decision of 11 February 2026 on the rationalization of tariff (fixed charges); NEPRA determination of MEPCO's supply tariff, 7 January 2026 (three-phase supply and time-of-use meters at 5 kW); PITC complaint portal warning. Checked 26 September 2026.

Frequently asked questions

Is the MEPCO security deposit refundable?
Yes. NEPRA's Consumer Service Manual says the deposit is refunded when the connection is permanently disconnected and you apply for the refund, with the load sanctioning officer's approval and no dues outstanding. The refund is to be processed within 30 days of the request.
Can I pay the demand notices in instalments?
MEPCO may allow it if you ask. The manual lets the capital cost and security deposit notices be paid in instalments without mark-up, but any rise in material cost during that period is yours to pay, and MEPCO has to provide the connection within NEPRA's time frame only once the full amount is paid.
Why do two connections of the same load cost different amounts?
For the same category and area, the security deposit is a fixed rate per kW, so the difference comes from the capital cost: the material each site needs, the 8% installation charge on it, and any transformer or sharing charges for larger loads.
Does a temporary connection have a security deposit?
Yes, but it works differently. It equals the estimated cost of electricity for the temporary period, and it is refunded when the supply ends or adjusted if the connection is converted into a regular one.